ironhold.org

Tower Project, King Fahad Road, Riyadh

A high-rise tower project of approximately 20 floors, located on King Fahad Road in Riyadh and owned by Details Real Estate Company, required a robust waterproofing solution for its substructure elements during the construction phase. Given the project’s scale and critical structural components, ensuring long-term protection against groundwater ingress was a key priority. To achieve this, Xypex Admix C-1000 NF was incorporated directly into the concrete mix, providing integral waterproofing to the foundation and below-grade elements. Product Used: Xypex Admix C-1000 NF Client: Details Real Estate Company Contractor: Orak Holdings Scope: Raft foundation, basement structures, retaining walls, and water-retaining elements Details: The integral admixture approach ensured continuous waterproofing protection without reliance on external membrane systems, reducing installation risks and improving construction efficiency. Status: Project currently under construction Outcome: Durable, long-term waterproofing solution with enhanced resistance to water penetration and reduced maintenance requirements.