ironhold.org

Burj Doha – Hi-Rise Office Tower

The 46-story Burj Doha required extensive waterproofing for its triple-basement foundation. Xypex Admix was added directly to the concrete mix, ensuring integral protection from groundwater. In Doha’s high-salinity soil conditions, this crystalline solution significantly extended the lifespan of the foundation by sealing micro-cracks and voids within the concrete. Product Used: Xypex Admix C-1000 NF Scope: 3-level basement and retaining walls Details: Integrated admixture approach eliminated the need for traditional sheet membranes. Outcome: Continuous waterproofing with enhanced durability and reduced maintenance.